About The Projects
International Projects Handled
Contour survey
- Sango- Outta Ogune State, Nigeria (South Africa)
- Indonesia sumbai rumbai dis Padang
Belt Conveyors Survey
- HAMBANTOT, Hambantota, South Srilanka
Domestic Projects Handled
Ground Control Network using DGPS
- Ground Control Points (using DGPS) for SOI & Image Registration: For specified districts in Madhya Pradesh & Chhattisgarh States – project for ISRO, WAPCOS, PAN INDIA
- Road survey for SOI Toposheet (using Kinematic mode DGPS): Four districts in Chhattisgarh State – project for ISRO
Roads (Triangulation & Control Points) using DGPS
- Samruddhi Mahamarg (Maharashtra, Mehkar to Sindhkhed Raja) – 50km
- National Highway No. 1 (Ludhiana to Jalandhar) – 50km
- National Highway No. 6 (kanyakumari to Tirunalvelli) – 60km
- National Highway No. 7 (Lakhni to Rajnandgaon) – 170km
- State Highway No. 57 (Himayatnagar to Mahur) – 50km
- Indore Edlabad Road – 203km
- Amravati Bypass – 25km
- Akola Bypass – 15km
Railway Alignment: Detailed Engineering survey for new rail alignment using DGPS & Total Station
- The gauge conversion for South Eastern Railway
- Nagpur – Chhindwara (M.S. & M.P.) railway line
- Chhindwara – Jabalpur (M.P.) railway line
- New dedicated rail alignment for power plant at Butibori (M.S.)
Metro rail using DGPS & Total Station
- Detailed Project Report for extension of Nagpur Metro in Phase –II
- Detailed as-built drawing of station area and its surrounding for development of Metro Stations
Route Survey using DGPS & Total Station
- For Optic Fiber Cable (OFC): Carried out for Reliance India Mobile
- Nagpur Dhulia Road
- Bhopal Road
- Aurangabad – Dhulia Road
- For laying pipe line Oil & Gas
- For ONGC in Krishna Dist. (AP)
- Dahej Nagathane Ethane Pipeline (DNEPL) Project (Gujarat)
Power Transmission Tower Line survey using DGPS & Total Station
- Fixing alignment and preparation of L-Section for 440 KV towerline of MSEB, Bhadravati
- Fixing alignment and preparation of L-Section& Spotting tower for
- 400KV tower line of Reliance Power (Butibori)
- 220KV tower line of Reliance Cement (Wani)
- 132KV tower line of Reliance Power (Sasan)
Topographic Survey & allied works for exploration well drilling
- For Gas Authority of India Ltd (GAIL)
- Shri Ganganagar. Dist.(RJ)
- Tanjayur Dist.(TN)
Contour Survey for Open Cast Mines (using DGPS & Total Station)
- Zuwari cement
- Jaypee Cement
- NTPC (Patratu, Pudimadka)
- Wardha Power
- Batarni Mine
- Siddnath Mine
- Kiranapur mine
- Deepaka mine
Contour Survey for Petrol pumps (using DGPS & Total Station): Carried out for Retail Outlet of Reliance Petroleum Ltd. in
- Chhattisgarh state
- Maharashtra State
- Andhra Pradesh
Contour Survey for premises (using DGPS & Total Station)
- Reliance Power plant near Boutibori
- M/S Indorama synthetics M/S Morarjee Mills, Nagpur
- M/S Norton Grindwell, Nagpur.
- M/S Hindustan Lever ltd, Chhindwara
- Hindi University at Wardha
Irrigation (Command area) using DGPS
- Gosikhurd Canal, Chandrapur district (10000 Ha)
Water Supply projects using DGPS & Total Station
- Maharashtra Jeevan Pradhikaran (MJP) for town Water Supply Scheme (Talegaon, Rajura, Chichgad)
- Jal Jeevan mission – Supervision and Quality Check of DGPS survey of water pipeline carried out by the consultant appointed by the client.
Layout demarcation of areas using DGPS & Total Station
- Planning & demarcation of plots for CIDCO, Raipur
- Planning & demarcation of plots for RIICO, (Rajasthan)
- Industrial Area at Ghiloth (Rajasthan)
- New Industrial Area at Kolila Joga (Rajasthan)
Flood zone mapping using Total Station
- Flood zone mapping and flood control measures of Ulhas river in thane district
Slum mapping (Nagpur) using Total Station
- Sudergradh slum
- Panchsheel Nagar
- Habib Nagar